Optimizing the Operation of a Multiple Reservoir System in the Eastern Nile Basin Considering Water and Sediment Fluxes (e-bog) af Digna, Reem Fikri Mohamed Osman

Optimizing the Operation of a Multiple Reservoir System in the Eastern Nile Basin Considering Water and Sediment Fluxes e-bog

619,55 DKK (inkl. moms 774,44 DKK)
The Eastern Nile riparian countries Egypt, Ethiopia and Sudan are currently developing several reservoir projects to contribute to the needs for energy and food production in the region. The Nile Basin, particularly the Eastern Nile Sub-basin, is considered one of a few international river systems with potential conflicts between riparian countries. In the absence of formal mechanisms for colla...
E-bog 619,55 DKK
Forfattere Digna, Reem Fikri Mohamed Osman (forfatter)
Forlag CRC Press
Udgivet 25 februar 2021
Længde 190 sider
Genrer 1HBEN
Sprog English
Format epub
Beskyttelse LCP
ISBN 9781000203011
The Eastern Nile riparian countries Egypt, Ethiopia and Sudan are currently developing several reservoir projects to contribute to the needs for energy and food production in the region. The Nile Basin, particularly the Eastern Nile Sub-basin, is considered one of a few international river systems with potential conflicts between riparian countries. In the absence of formal mechanisms for collaboration, the transboundary nature of this basin makes sound water resources development challenging. The large seasonal and inter-annual variability of the river flow exacerbates those challenges. A further complication is the high sediment load in the Eastern Nile rivers during the high flow season.This study contributes to fill relevant knowledge gaps through a better understanding of the methods needed for a complex system of multipurpose reservoirs, considering both water quantity and sediment load. The study quantifies the impacts of water resources development in the Eastern Nile basin and identifies system management options at both regional and country level. Developing a collaborative and unified perspective of the countries towards new projects can be beneficial for all. New operation rules are proposed for improving operation of the current system when new infrastructures are developed and operated either unilaterally or, ideally, cooperatively.