Time-To-Build e-bog
436,85 DKK
(inkl. moms 546,06 DKK)
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction indus...
E-bog
436,85 DKK
Forlag
Springer
Udgivet
6 december 2012
Genrer
Population and demography
Sprog
English
Format
pdf
Beskyttelse
LCP
ISBN
9783642468155
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry and by the estimation result from the manufacturing industry of six OECD countries.