Operations Research in the Airline Industry (e-bog) af -
Yu, Gang (redaktør)

Operations Research in the Airline Industry e-bog

2190,77 DKK (inkl. moms 2738,46 DKK)
260 2 Crew Legalities and Crew Pairing Repair 264 3 Model and Mathematical Formulation 266 4 Solution Methodology 271 5 Computational Experiences 277 6 Conclusion 285 REFERENCES 286 10 THE USE OF OPTIMIZATION TO PERFORM AIR TRAFFIC FLOW MANAGEMENT Kenneth Lindsay, E. Andrew Boyd, George Booth, and Charles Harvey 287 1 Introduction 288 2 The Traffic Flow Management (TFM) Problem 289 3 Recent TFM...
E-bog 2190,77 DKK
Forfattere Yu, Gang (redaktør)
Forlag Springer
Udgivet 6 december 2012
Genrer Management decision making
Sprog English
Format pdf
Beskyttelse LCP
ISBN 9781461555018
260 2 Crew Legalities and Crew Pairing Repair 264 3 Model and Mathematical Formulation 266 4 Solution Methodology 271 5 Computational Experiences 277 6 Conclusion 285 REFERENCES 286 10 THE USE OF OPTIMIZATION TO PERFORM AIR TRAFFIC FLOW MANAGEMENT Kenneth Lindsay, E. Andrew Boyd, George Booth, and Charles Harvey 287 1 Introduction 288 2 The Traffic Flow Management (TFM) Problem 289 3 Recent TFM Optimization Models 292 4 The Time Assignment Model (TAM) 302 5 Summary and Conclusions 307 REFERENCES 309 11 THE PROCESSES OF AIRLINE SYSTEM OPERATIONS CONTROL Seth C. Grandeau, Michael D. Clarke, and Dennis F.X. Mathaisel 312 1 Introduction 313 2 The Four Phases of Airline Schedule Development 315 The Airline Operations Control Center (OCC) 3 320 4 Analysis of Operational Problems 331 5 Areas For Improvement 352 6 Case Study: PT Garuda Indonesia Airlines 357 REFERENCES 368 12 THE COMPLEX CONFIGURATION MODEL Bruce W. Patty and Jim Diamond 370 1 Introduction 370 Problem Description 2 371 Problem Formulation 3 375 4 Model Implementation 379 ix Contents 383 5 Summary REFERENCES 383 13 INTEGRATED AIRLINE SCHEDULE PLANNING Cynthia Barnhart, Fang Lu, and Rajesh Shenoi 384 1 Introduction 385 2 Fleet Assignment and Crew Pairing Problems: Existing M- els and Algorithms 388 3 An Integrated Approximate Fleet Assignment and Crew Pa- ing Model 393 4 An Advanced Integrated Solution Approach 395 5 Case Study 396 6 Conclusions and Future Research Directions 399 REFERENCES 401 14 AIRLINE SCHEDULE PERTURBATION PROBLEM: LANDING AND TAKEOFF WITH