Cutoffs for Dams (e-bog) af -
ICOLD, CIGB (redaktør)

Cutoffs for Dams e-bog

875,33 DKK (inkl. moms 1094,16 DKK)
ICOLD Bulletin 150, Cutoffs for Dams, discusses foundation treatment methods using cutoff-type barriers. High emphasis is given to alluvial deposits throughout this document; however, different materials may require cutoff. The construction of cutoffs has made significant advances mainly through the development of more powerful machinery for drilling and excavation, but also through the introdu...
E-bog 875,33 DKK
Forfattere ICOLD, CIGB (redaktør)
Forlag CRC Press
Udgivet 7 december 2018
Længde 288 sider
Genrer Civil engineering, surveying and building
Sprog English
Format epub
Beskyttelse LCP
ISBN 9781351035965
ICOLD Bulletin 150, Cutoffs for Dams, discusses foundation treatment methods using cutoff-type barriers. High emphasis is given to alluvial deposits throughout this document; however, different materials may require cutoff. The construction of cutoffs has made significant advances mainly through the development of more powerful machinery for drilling and excavation, but also through the introduction of new concepts and techniques, such as jet grouting and deep soil mixing. The following types of cutoffs are presented in this Bulletin: - Diaphragm walls- Vib walls- Pile walls- Superimposed concreted galleries- Jet grouting- Deep mixingThese methods are described, and the practical application of each method is illustrated by selected case histories. These case histories also demonstrate how certain difficulties specific to a particular dam site have been dealt with. The performance of cutoffs should be monitored so that their efficiency in reducing flow and piezometric head can be evaluated. Piezometers installed in the foundation upstream and downstream of the cutoff are needed to meet this objective.