Labyrinth and Piano Key Weirs III (e-bog) af -
Pfister, Michael (redaktør)

Labyrinth and Piano Key Weirs III e-bog

2190,77 DKK (inkl. moms 2738,46 DKK)
Since the first implementation by Electricite de France on the Goulours dam (France) in 2006, the Piano Key Weir has become a more and more applied solution to increase the discharge capacity of existing spillways. In parallel, several new large dam projects have been built with such a flood control structure, usually in combination with gates. Today, more than 25 Piano Key Weirs are in operati...
E-bog 2190,77 DKK
Forfattere Pfister, Michael (redaktør)
Forlag CRC Press
Udgivet 11 april 2017
Længde 284 sider
Genrer Civil engineering, surveying and building
Sprog English
Format pdf
Beskyttelse LCP
ISBN 9781351687836
Since the first implementation by Electricite de France on the Goulours dam (France) in 2006, the Piano Key Weir has become a more and more applied solution to increase the discharge capacity of existing spillways. In parallel, several new large dam projects have been built with such a flood control structure, usually in combination with gates. Today, more than 25 Piano Key Weirs are in operation or under construction all over the world. More than 15 years of research and development have enabled detailed investigations of the hydraulic and structural behaviour of the Piano Key Weir complex structure and have provided more and more accurate design equations. Following the proceedings of the first two workshops held in Liege (Belgium - 2011) and Paris (France - 2013), Labyrinth and Piano Key Weirs III collects the contributions presented by people with varied background, from researchers to practitioners, at the 3rd International Workshop on Labyrinth and Piano Key Weirs - PKW 2017 (22-24 February 2017, Qui Nhon, Vietnam). The papers, reviewed and accepted by an International Scientific Committee, summarize the current state-of-the-art on Piano Key Weirs from a theoretical to a practical point of view, and present most of the main projects in operation or under construction. Labyrinth and Piano Key Weirs III is thus a reference for students, practitioners and researchers interested in Dams Engineering.